On this page
For a custom peptide, send providers the same sequence specification and requested deliverables before comparing prices. A catalogue name is not enough when your project depends on particular terminal groups, modifications or analytical records.
Canadian university facilities and commercial providers publish custom-synthesis services, but a public page does not confirm present capacity for your project. Start with a feasibility enquiry and a versioned request for quotation, or RFQ.
Two Canadian service routes to investigate
These examples were checked on 10 October 2026 (UTC). They are not ranked, and their inclusion does not establish that they appear in PepSpotter’s vendor or price data.
McGill’s listed Peptide Synthesis Laboratory
The McGill service page identifies a laboratory at the Lady Davis Institute in Montréal. It describes custom and contract peptide work, including modifications such as cyclization and terminal changes, and says analytical HPLC and mass spectra are provided.
Ask whether the facility currently accepts your institution and project, who should review the specification, and which deliverables would be included in the quotation. The page is a useful contact lead, not a commitment to an external customer or delivery date.
CanPeptide
CanPeptide describes itself as a Canadian custom-peptide company serving academic and commercial research customers. Its published services include modified peptides, several purity levels, and analytical documents including chromatograms, mass spectra and a COA.
Use its published quotation route to establish feasibility and the proposed supply specification. Confirm the project’s performing location, commercial terms and documentation rather than extending a company-level Canadian identity claim to every stage of your order.
Write a specification that survives a handoff
Give the project a reference and version, such as “Project R1, specification v2.” Keep the sequence in a controlled attachment or field your team has checked. A corrected sequence should produce a new version, with the old request clearly superseded.
The name-and-variant guide helps identify naming gaps, but the supplier still needs your actual project specification. Do not let a familiar abbreviation stand in for terminal groups or modifications.
Use this worksheet as a starting point for your research team’s review:
| RFQ field | State or ask |
|---|---|
| Sequence | Exact sequence, notation used and specification version |
| Termini and modifications | Required terminal groups, modification sites and any labels or conjugation requirements |
| Delivered material | Requested amount, form, number of containers and amount per container |
| Purity requirement | Required specification, how it is assessed and the report expected |
| Other material attributes | Any project-required counterion or other defined attribute; mark unresolved points for technical review |
| Analytical records | Requested identity evidence, chromatogram, mass spectrum, COA and any additional agreed record |
| Acceptance | How the team will decide whether the delivered material meets the agreed specification |
| Feasibility and timing | Technical constraints, earliest proposed completion and what the quoted lead time includes |
| Commercial terms | Currency, quote validity, additional charges and terms if the requested specification cannot be achieved |
This is a specification checklist for a qualified provider, not a synthesis protocol. Your scientific lead should choose the material requirements that the project actually needs.
Resolve amount and documentation before accepting the price
Ask the supplier to define the quoted amount and how it will be documented. Avoid assuming that a synthesis scale, a crude-material amount and an agreed amount of delivered purified material mean the same thing.
Fictional example: a team requests 25 mg of a specified modified peptide, with an agreed purity criterion and named analytical records. One quote covers 25 mg of crude material; another covers the requested purified material and documents. The first quote does not yet answer the RFQ, even if its price is lower.
The next question is narrow: “Can you quote the delivered material and analytical package in specification v2, or identify each proposed deviation?”
Keep all deviations visible for technical review. The COA guide explains how to connect a report to the material later supplied; requesting a document by name does not settle its contents in advance.
Make the Canadian procurement questions explicit
Ask which entity will contract with your institution, where the work and dispatch are expected to occur, and what paperwork your purchasing team needs. If those locations differ, record each one. The seller-location guide explains why a Canadian business address alone does not establish dispatch or manufacturing origin.
Then compare confirmed responses using the supplier-quote worksheet. That guide handles quote versions and costs; this specification sheet establishes which custom project each price covers.
Know when a catalogue comparison is insufficient
A stocked-product comparison can help you understand available listings. It cannot replace a feasibility decision on your custom sequence or establish that a supplier accepts your specification. PepSpotter’s methodology describes the scope of its price data.
The useful endpoint is a written, technically reviewed specification and a quotation that explicitly accepts it or records the exceptions. Keep that agreement with the final analytical documents so the order can be checked against what your team actually requested.